Commercial Solar Over 100kW: What the New STC Changes Mean for Australian Businesses

Commercial Solar Over 100kW: What the New STC Changes Mean for Australian Businesses

For years, 100 kW has been an important dividing line for commercial solar in Australia.

Eligible solar PV systems up to 100 kW could generally access Small-scale Technology Certificates, or STCs, through the Small-scale Renewable Energy Scheme (SRES).

Move above 100 kW, however, and a project generally entered the Large-scale Renewable Energy Target (LRET), where eligible systems could create Large-scale Generation Certificates, or LGCs.

That distinction has influenced how commercial solar projects are sized.

Now, the Australian Government has announced plans to expand the SRES to eligible solar PV systems above 100 kW and no more than 1 MW.

The intended commencement date is 1 October 2026.

For businesses capable of using considerably more than 100 kW of solar, the change could make larger projects worth reassessing.

Commercial solar over 100 kW — hub: start here for the policy change, then go deeper: how to size 200 kW, 500 kW or 1 MW · STCs vs LGCs · five-year STC rule to 2030 · NSW BESS4 & BESS5 battery rebate · batteries for peak shaving and grid constraints · our commercial solar approach.

Important: the expansion is not yet in force

As at 9 September 2026, the new arrangements have been announced but have not yet commenced.

The Australian Government intends for the SRES changes to apply to mid-scale solar installed from 1 October 2026, subject to the required regulations being in place.

Current Clean Energy Regulator guidance therefore continues to apply until those changes commence. Businesses considering projects around the commencement date should confirm the final regulations and CER eligibility requirements before relying on the new STC arrangements.

What changes if your business wants more than 100 kW of solar?

The main change is straightforward.

Historically, crossing 100 kW generally meant moving from the STC pathway to the LGC pathway.

Under the announced expansion, eligible new solar installations above 100 kW and no more than 1 MW may instead be able to create STCs through the SRES.

Solar systemCertificate pathway
Eligible system up to 100 kWSRES and STCs
Above 100 kW historicallyLRET and LGCs, subject to eligibility
Announced above 100 kW to 1 MW pathwayEligible projects may access STCs
Above 1 MWLRET/LGC pathway

For businesses, this matters because STCs and LGCs affect project economics differently. For a more detailed comparison, see our guide to STCs vs LGCs for commercial solar.

It also means the historical 100 kW incentive threshold may become much less important when deciding how much solar a site actually needs.

Instead of asking:

“How do we keep this system under 100 kW?”

A better question may be:

“How much solar can this site actually use economically?”

What are STCs?

Small-scale Technology Certificates are tradable certificates created under the SRES.

For most commercial customers, the important point is their effect on upfront project cost.

System owners commonly assign their right to create STCs to a registered agent or solar provider. In return, the certificate value can be reflected as an upfront reduction in the installation price.

This is why STCs are often described as a solar rebate, although technically they are part of a certificate-based federal incentive scheme rather than a fixed-dollar government cash rebate.

How are LGCs different?

Large-scale Generation Certificates work differently.

Eligible renewable-energy power stations participating in the LRET require accreditation, and certificates are created from eligible renewable electricity after it has been generated.

Generally, one LGC represents one megawatt-hour of eligible renewable electricity.

In simple terms:

STCs can generally bring certificate value forward into the upfront project cost.

LGCs are created progressively as eligible renewable electricity is generated.

For a business comparing a 100 kW system with a 200 kW, 500 kW or larger project, this can affect project cash flow and administration.

What is changing for 100 kW to 1 MW commercial solar?

Under the announced arrangements, eligible mid-scale solar installations would include systems:

  • above 100 kW
  • no more than 1 MW
  • installed from the intended commencement date
  • meeting the applicable eligibility and compliance requirements.

For expansions to existing systems, the maximum combined capacity would be 1 MW.

Installer and product accreditation, state and territory electrical safety requirements, relevant planning approvals and network connection agreements would still apply.

For commercial solar, this potentially removes one of the strongest historical incentive boundaries between a project around 100 kW and a larger mid-scale installation.

Why the five-year STC deeming period matters

The increase to 1 MW is only part of the announcement.

One of the most important details is how the proposed STC factor will work for larger commercial systems through 2030. For a deeper explanation, see our guide to the five-year commercial solar STC deeming period through 2030.

The Government has announced that the STC factor applying to mid-scale solar PV will be based on a five-year deeming period each year through 2030.

That is different from the existing solar deeming schedule, which reduces by one year each year as the SRES approaches 2030.

Installation yearExisting solar deeming periodAnnounced mid-scale basis
20265 years5 years
20274 years5 years
20283 years5 years
20292 years5 years
20301 year5 years

For qualifying mid-scale projects, the announced approach means a project installed in a later year would still have its STC factor based on a five-year period rather than progressively losing another year of deeming.

Does that mean STCs will be worth the same until 2030?

No.

There is an important distinction between:

the five-year deeming basis remaining consistent

and

the market value of an individual STC remaining consistent.

STCs are tradable certificates. Open-market pricing is influenced by supply and demand and can vary.

The five-year announcement therefore does not guarantee a fixed-dollar solar rebate through 2030.

Should businesses still stop at 99 or 100 kW?

Not automatically.

For many commercial sites, 100 kW was never necessarily the ideal amount of solar. It was an important incentive threshold.

A warehouse, manufacturer or agricultural facility may have enough daytime electricity demand to efficiently use 200 kW, 400 kW or considerably more.

If the changes proceed as announced, the old STC threshold could become much less important.

That does not mean every business should install the largest solar array its roof can accommodate.

The right commercial solar system is generally the one that best matches the site’s:

  • interval electricity consumption
  • daytime load
  • expected self-consumption
  • maximum demand
  • network export constraints
  • available roof space
  • future electricity requirements
  • potential battery integration.

Start commercial solar sizing with interval data

Annual electricity consumption alone does not tell you when a business uses energy.

Interval meter data provides a much clearer picture of the site’s:

  • daytime electricity demand
  • overnight base load
  • maximum demand
  • seasonal changes
  • potential solar exports.

Two businesses can use exactly the same number of kilowatt-hours in a year and require completely different solar systems.

A facility operating machinery throughout the day may be able to self-consume a much larger solar array than a site where most electricity demand occurs after sunset.

Our guide to commercial solar system sizing explains how interval data, daytime demand, exports and future loads can be used to compare systems such as 200 kW, 500 kW and 1 MW.

Consider solar self-consumption

Solar used directly by the business generally has a different value from electricity exported to the grid.

A commercial assessment should therefore estimate how much generation will:

  • supply existing site loads
  • be exported
  • potentially be curtailed
  • potentially charge a battery.

As systems become larger, this becomes increasingly important.

Network limits still matter

Removing the historical 100 kW STC boundary does not remove electricity-network requirements.

Depending on the site and local network, larger projects may involve:

  • connection applications
  • export limits
  • export-control systems
  • protection studies
  • electrical engineering
  • switchboard or metering changes.

A system may sometimes be larger than the permitted export capacity if suitable export controls and network approval are in place, but this must be assessed project by project.

What about battery storage?

Commercial battery storage can change the solar opportunity.

A battery may allow excess daytime generation to be stored for use later, while also potentially supporting load shifting, peak-demand management or backup requirements.

For NSW businesses, battery opportunities may also need to be assessed alongside separate BESS4 and BESS5 commercial battery incentives.

Solar and battery capacity should still be based on the site’s actual electricity profile and commercial objectives rather than simply maximising available incentives.

What types of businesses could benefit?

The announced expansion is particularly relevant to sites sitting between traditional small commercial solar and large-scale renewable projects.

Examples include:

  • warehouses and logistics facilities
  • manufacturers
  • farms and agricultural processors
  • shopping centres
  • schools
  • hospitals and healthcare facilities
  • offices and larger commercial buildings.

Whether a particular site should install more than 100 kW still depends on its individual electricity profile and project economics.

What happens above 1 MW?

The announced expansion stops at 1 MW.

New systems greater than 1 MW are expected to remain within the Large-scale Renewable Energy Target pathway, subject to the relevant LRET requirements.

Existing mid-scale solar systems already supported under the LRET are also expected to continue under that scheme rather than automatically moving to the SRES.

Projects close to 1 MW should therefore have their proposed configuration and certificate pathway reviewed carefully.

Larger solar still requires proper engineering

STC eligibility does not turn a 500 kW commercial solar project into the same engineering exercise as a small rooftop installation.

Depending on the site, larger projects can still involve:

  • network approval
  • grid-protection requirements
  • electrical engineering
  • structural assessment
  • switchboard upgrades
  • metering changes
  • planning requirements
  • eligible products and installers
  • commissioning and compliance documentation.

The proposed SRES expansion should primarily be viewed as a change to the incentive framework, not the removal of normal commercial-project requirements.

Why commercial solar over 100 kW may be worth reassessing

Consider a business where interval electricity data suggests that approximately 250 kW of solar could be used effectively.

Historically, the business might have compared a system close to 100 kW receiving STCs with a larger system under the LGC framework.

Under the announced changes, an eligible 250 kW project may instead be able to access STCs.

That does not automatically make a 250 kW system the right answer.

But it changes the commercial calculation.

Projects previously restricted to around 100 kW, or considered marginal under the LGC pathway, may now be worth modelling again.

What should businesses do now?

Businesses considering commercial solar over 100 kW should start with the site’s electricity data.

A useful assessment should consider:

  1. interval electricity consumption
  2. daytime and maximum demand
  3. electricity tariffs
  4. available roof or ground area
  5. network export constraints
  6. expected solar self-consumption
  7. future electricity demand
  8. battery opportunities
  9. applicable federal and state incentives.

For projects expected to proceed from October 2026, the final regulations and latest Clean Energy Regulator guidance should also be confirmed before relying on expanded STC eligibility.

The historical 100 kW STC barrier may become less relevant, but the best system size should still be determined by what makes commercial sense for the individual site.

Frequently asked questions

Can commercial solar systems over 100 kW receive STCs?

Under the rules applying as at 9 September 2026, the announced expansion has not yet commenced.

The Government intends to extend the SRES to eligible solar PV systems above 100 kW and no more than 1 MW from 1 October 2026, subject to regulations being in place.

Are STCs available for a 200 kW commercial solar system?

A 200 kW system falls within the announced mid-scale capacity range.

It may become eligible once the new arrangements commence, provided the installation satisfies the final eligibility requirements.

Will commercial solar STCs reduce before 2030?

The Government says the STC factor for mid-scale solar will be based on a five-year deeming period in each year through 2030.

This does not guarantee the market price of individual STCs.

What is the difference between STCs and LGCs?

STCs can commonly be assigned so their value is reflected in the upfront cost of an eligible installation.

LGCs are created by eligible accredited renewable-energy power stations based on renewable electricity generated.

What is the maximum solar system size eligible under the proposed changes?

The announced mid-scale SRES expansion covers eligible solar PV systems above 100 kW and no more than 1 MW.

Planning a commercial solar project?

Carbon Heroes works with NSW businesses on commercial solar projects designed around actual electricity consumption, site requirements and commercial objectives.

We can assess your interval electricity data, energy costs and site requirements to determine whether a commercial solar system above 100 kW makes commercial sense for your business.

For projects planned around the SRES expansion, the applicable incentive pathway should also be checked against the latest eligibility requirements before installation.

Talk to us about your site for a commercial assessment covering sizing, tariffs and the incentive pathway.

Sources

Ready to get started?

Could your site use more than 100 kW of solar?

We can review your electricity use, roof and connection limits to assess a larger system and the incentive pathway that may apply.

1300 728 387
Assess my solar project over 100 kW