Commercial Solar STCs vs LGCs: What’s the Difference?

Commercial Solar STCs vs LGCs: What’s the Difference?

If your business is looking at commercial solar, you may come across two similar-sounding terms:

STCs and LGCs.

Both are renewable-energy certificates created under Australia’s Renewable Energy Target, but they have historically applied to different types of solar projects and work in very different ways.

For commercial solar, the 100 kW threshold has traditionally been the dividing line.

Understanding that difference has become even more important following the Australian Government’s announced expansion of the Small-scale Renewable Energy Scheme to eligible solar systems above 100 kW and up to 1 MW. For the broader policy change, read our guide to commercial solar over 100 kW and the new STC arrangements.

STCs vs LGCs at a glance

ComparisonSTCsLGCs
Full nameSmall-scale Technology CertificatesLarge-scale Generation Certificates
SchemeSmall-scale Renewable Energy Scheme (SRES)Large-scale Renewable Energy Target (LRET)
Traditional solar treatmentEligible systems up to 100 kWSystems above 100 kW
Certificate timingTypically brought forwardCreated after generation
Typical commercial treatmentOften reflected in the upfront project priceCertificate value realised progressively
AccreditationSRES eligibility requirementsPower-station accreditation
Generation basisDeemed under applicable rulesEligible renewable electricity actually generated
Certificate market valueVariableVariable

What are STCs?

Small-scale Technology Certificates form part of the Small-scale Renewable Energy Scheme.

When an eligible system is installed, the owner may create STCs or assign the right to create them to another party.

In practice, solar retailers and installers commonly apply the value of those certificates as an upfront reduction in the project price.

That is one reason STCs are often referred to as a solar rebate.

However, STCs are not a fixed-dollar government payment.

They are tradable certificates, and their value can change according to market conditions. Open-market STC prices are influenced by supply and demand.

What are LGCs?

Large-scale Generation Certificates operate under the Large-scale Renewable Energy Target.

To create LGCs, an eligible renewable-energy project must be accredited as a power station.

Certificates are then created based on eligible renewable electricity actually generated.

One LGC represents one megawatt-hour of eligible renewable electricity generated or displaced by an accredited power station.

This means LGC value is generally realised progressively as the system operates rather than being brought forward in the same way as STCs.

Why has 100 kW traditionally mattered?

Under the current framework, solar PV systems need to be no more than 100 kW to fit within the normal SRES solar capacity limit.

Systems that exceed 100 kW have generally moved into power-station treatment under the LRET, subject to the relevant eligibility requirements.

This created a significant commercial boundary.

A business considering:

  • 99 kW of solar
  • 150 kW of solar
  • 300 kW of solar

was not simply choosing between three system sizes.

Crossing 100 kW also meant changing incentive pathways.

For some businesses, that could make a system around 100 kW attractive even where the site’s daytime electricity demand could support substantially more solar.

What is changing?

The Australian Government has announced that the SRES will expand to provide STCs for eligible mid-scale solar installations above 100 kW and no more than 1 MW.

The intended commencement date is 1 October 2026, subject to regulations being in place.

If implemented as announced, this means an eligible new 200 kW, 500 kW or 1 MW system would not automatically need to rely on the LGC pathway simply because it exceeds 100 kW.

Important regulatory note

As at 9 September 2026, these arrangements have not yet commenced.

Businesses should check the final regulations and latest Clean Energy Regulator guidance before relying on STC eligibility for a system above 100 kW.

How does STC timing differ from LGC timing?

This is one of the most commercially important differences.

With STCs, certificate support can generally be brought forward and incorporated into the installation price.

With LGCs, eligible certificates are created after generation occurs.

For a business funding a solar installation, the difference can influence:

  • upfront capital required
  • project cash flow
  • administration
  • certificate management.

It does not necessarily mean one pathway is always better.

But the way the financial benefit is realised is different.

Are certificate prices guaranteed?

No.

Both STCs and LGCs are tradable certificates.

Their market values can change.

This is particularly important when discussing the announced five-year deeming treatment for mid-scale STCs. We explain exactly what stays consistent, and what does not, in our guide to commercial solar STCs through 2030.

The Government has announced that the STC factor for eligible mid-scale solar will continue to use a five-year deeming basis each year through 2030.

That does not mean the market price of an STC is fixed through 2030.

What happens to systems above 1 MW?

The announced SRES expansion stops at 1 MW.

New systems greater than 1 MW are expected to remain under the LRET, subject to the applicable requirements.

This means the broad proposed structure is:

Up to 100 kW: SRES/STCs

Above 100 kW to 1 MW: announced mid-scale SRES/STC pathway

Above 1 MW: LRET/LGC pathway

What about existing LGC-accredited systems?

Existing accredited mid-scale solar projects are not expected to be moved into the SRES.

Government guidance says existing systems already supported under the LRET will continue to operate under that scheme and remain eligible for LGCs.

Which pathway should determine system size?

Ideally, neither.

Incentives are important to commercial project economics, but the certificate threshold should not be the primary method used to determine how much solar a business installs.

System sizing should begin with interval electricity data, daytime load, electricity tariffs, roof or ground space, network export limits, solar self-consumption, future electricity demand and potential battery storage. See our guide to sizing a 200 kW, 500 kW or 1 MW commercial solar system for a practical explanation.

A business with a consistent 400 kW daytime load may have a very different optimal system size from a business with the same annual electricity consumption but only 80 kW of load during solar-production hours.

The certificate treatment should then be incorporated into the commercial model.

The practical takeaway

Historically, the STC/LGC divide meant going above 100 kW changed more than the number of panels being installed.

It changed the incentive pathway.

If the Government’s SRES expansion proceeds as announced, that difference will become much smaller for eligible systems between 100 kW and 1 MW.

That could make larger commercial solar projects worth reassessing, particularly where a proposed system had previously been limited to around 100 kW because of the STC threshold.

Frequently asked questions

Are STCs better than LGCs?

Not necessarily.

They operate differently. STC value is commonly brought forward into the installation cost, while LGCs are created from eligible renewable generation after it occurs.

The appropriate treatment depends on the system and regulations applying to the project.

Does a 200 kW solar system currently receive STCs?

The announced expansion has not yet commenced as at 9 September 2026.

A 200 kW system falls within the proposed mid-scale range and may become eligible once the new regulations take effect.

Does a 1 MW solar system receive STCs?

Under the announced arrangements, eligible systems above 100 kW and no more than 1 MW would be covered by the expanded SRES.

What happens at 1.1 MW?

A new 1.1 MW installation would sit above the announced SRES maximum and would remain within the LRET/LGC pathway, subject to eligibility.

Planning commercial solar above 100 kW?

Learn more about how Carbon Heroes approaches commercial solar system design.

We can assess your electricity profile, site requirements and proposed system capacity to help determine an appropriate commercial solar design and the certificate pathway applying to the project.

Talk to us about your site for a commercial assessment covering interval data, tariffs and the STC/LGC pathway applying to your project.