Is Your Factory Paying Too Much for Electricity? 5 Signs Solar and Battery Storage Could Help
Key Takeaways for Factory Owners
- Daytime production, costly demand peaks, unused solar, later shifts and limited grid supply are five reasons to review your factory’s energy setup.
- Commercial solar and battery storage could help reduce electricity costs, manage peak demand or support temporary power requirements.
- Carbon Heroes’ consultants can help assess your energy use and recommend a suitable system around your operating needs and business goals.
Your factory’s electricity bill reflects more than how much equipment you run. When machines operate, how their loads overlap and your electricity pricing can all affect what you pay.
For factory owners, manufacturing directors and plant managers, the opportunity starts with understanding where those costs come from—and which improvements could help.
At Carbon Heroes, we assess your electricity use, production schedule and site conditions to explore suitable commercial solar and battery solutions. Whether your priority is lower bills, better use of existing solar or supporting additional machinery, our consultants can help you understand your options.
Here are five signs your factory could benefit from an energy assessment.
1. Your factory uses substantial electricity during daylight hours
If production runs while the sun is shining, commercial solar could supply part of the electricity your factory would otherwise purchase.
In a fabrication factory, machinery, extraction fans and compressed-air equipment can create steady daytime demand. Rooftop solar could help supply those loads as electricity is generated.
The opportunity depends on how closely your production hours match solar output. Weekend closures, maintenance shutdowns and seasonal changes all influence how much solar your factory can use.
The right system size also depends on your roof, shading, budget and connection requirements. The Australian Government’s solar guidance for businesses explains why electricity use and timing matter when choosing a system.
Our consultants can review these factors to recommend a solar system suited to your factory’s operations.
What to check: How consistently does production demand overlap with solar generation across the year?
2. Short production peaks are pushing up your bill
When compressors, extraction equipment and production machinery operate together, your factory’s electricity demand can rise sharply.
If your electricity plan includes demand charges, these overlapping loads may increase your bill—even when total monthly electricity consumption changes little.
A suitably designed battery could supply part of the electricity during those periods, reducing the power drawn from the grid. This is commonly called peak shaving, or peak reduction.
The first step is understanding how your tariff measures demand. A brief motor start may not have the same effect as a sustained peak measured over a billing interval. The Australian Government’s guidance on reviewing your business energy contract is a useful starting point for understanding your pricing arrangements.
Carbon Heroes can assess your demand patterns and tariff to investigate whether battery storage could help. Battery output, stored energy and controls need to match the timing and duration of your peaks.
What to check: Does your bill include demand charges, and which operating periods set them?
3. You export solar while buying electricity later
If your factory already has solar, battery storage could help you use more of the electricity it generates.
Production might slow around midday while solar output remains strong. Surplus electricity goes to the grid, then an afternoon shift increases demand as solar generation falls.
A battery could store some of that surplus for later production, reducing the electricity you need to buy.
The financial benefit depends on how much surplus is available, your export arrangements, later electricity prices and the cost of storage. Battery losses also need to be included. The Australian Government explains these considerations in its guide to how solar and batteries can reduce electricity bills.
Our consultants can review your existing solar system and usage patterns to assess whether adding storage would support your savings goals.
What to check: Do your export records show a regular solar surplus that later production could use?
4. Evening or overnight shifts keep electricity costs high
A second shift changes your factory’s energy needs, even if you have no solar yet.
A plastics manufacturer, for example, may continue production after sunset. Solar alone cannot directly supply that overnight demand. Battery storage could shift daytime solar into the later shift or charge from the grid when electricity is cheaper, where the tariff allows.
The right approach depends on how much electricity that shift uses and for how long. Supporting a short evening production window requires a different assessment from supplying machinery throughout the night.
Our consultants can help assess suitable solar and battery options against your shift patterns and electricity rates. The assessment should account for charging costs, battery losses and whether charging could create another expensive demand peak.
For further background, the Australian Government’s battery storage guide outlines the benefits and costs to consider before investing.
What to check: How much electricity does each shift use, and what does it cost during those hours?
5. New machinery is stretching your available power supply
Adding equipment can create a power challenge before it creates an energy bill.
If new machinery only occasionally runs alongside other major loads, battery storage may help supplement the available grid supply during those temporary peaks.
The battery needs sufficient power output and stored energy to support the additional load, plus time and available supply to recharge. Suitability depends on engineering assessment and relevant network requirements. The NSW Government’s battery storage technical guide discusses how businesses can investigate these applications.
A battery does not increase the safe capacity of existing switchboards, cables or protection equipment. Electrical upgrades may still be required, and sustained additional demand may need a grid supply upgrade.
Carbon Heroes can help investigate your site constraints and planned machinery requirements to assess where storage could form part of a suitable solution.
What to check: Where is the supply constraint, and how long does the additional demand last?
Our commercial battery guide to peak shaving and grid constraints explores these applications in more detail.
Which signs apply to your factory?
| What you notice | What to review first |
|---|---|
| Consistent daytime production | Solar generation against daytime electricity use |
| Expensive demand peaks | Tariff rules, peak duration and equipment schedules |
| Solar exports followed by later purchases | Export records, later usage and storage costs |
| Evening or overnight shifts | Shift consumption, charging opportunities and electricity rates |
| Expansion limited by available supply | Connection capacity, electrical infrastructure and future loads |
You may recognise more than one sign. A factory with daytime production and evening shifts, for example, may benefit from assessing solar and storage together.
The aim is to identify a system that supports your operating priorities, with expected benefits weighed against installation and ongoing costs.
Find out what could work for your factory
Whether you want to reduce electricity costs, manage demand peaks or support business expansion, Carbon Heroes’ consultants can guide you through an energy assessment and advise on an appropriate solar, battery or combined system.
To get started, gather recent electricity bills, your current tariff, available meter data, shift patterns and existing solar details. Include any planned machinery or production changes so we can consider your future needs.
Request an energy assessment with Carbon Heroes to discuss your factory’s energy goals and explore a suitable solution.