If you’re planning a commercial solar project above 100 kW, you may have heard that solar STC support reduces every year as the Small-scale Renewable Energy Scheme approaches 2030.

Under the Government’s announced arrangements for mid-scale commercial solar, however, that is not quite how the proposed calculation will work.

The Australian Government says the STC factor for eligible solar PV systems above 100 kW and no more than 1 MW will be based on a five-year deeming period each year through 2030.

If you’re unfamiliar with the broader change, start with our guide to commercial solar over 100 kW and the announced SRES expansion.

The five-year approach is an important distinction for businesses planning larger solar projects over the next several years.

It is also easy to misunderstand.

A five-year deeming period does not mean the dollar value of the STC incentive is guaranteed to remain the same.

First: what is STC deeming?

Under the SRES, eligible systems can create Small-scale Technology Certificates.

For solar, the certificate calculation incorporates a deeming period, which represents a future period of renewable generation.

Instead of waiting for years of solar electricity to be produced before certificate support is realised, the scheme can bring forward certificate creation based on applicable deeming arrangements.

For a fuller explanation of how the two certificate systems differ, see STCs vs LGCs for commercial solar.

For the existing solar scheme, the deeming period has been reducing as 2030 approaches.

The CER publishes the following schedule:

Installation yearExisting deeming period
20265 years
20274 years
20283 years
20292 years
20301 year

So under the existing treatment, a qualifying system installed in 2029 has a shorter deeming period than one installed in 2026.

What has the Government announced for mid-scale solar?

The Government has announced an expansion of the SRES to cover eligible solar PV systems:

  • above 100 kW
  • no more than 1 MW.

The intended commencement date is 1 October 2026, subject to regulations being in place.

One of the specific policy details is that the STC factor for mid-scale solar PV is intended to be based on a five-year deeming period in each year through 2030.

In practical terms, the announced structure looks like this:

Installation yearExisting solar deeming periodAnnounced mid-scale basis
20265 years5 years
20274 years5 years
20283 years5 years
20292 years5 years
20301 year5 years

For qualifying mid-scale projects…

This is one of the most commercially significant parts of the mid-scale announcement.

Why does the five-year basis matter?

Consider a qualifying commercial solar project installed in 2029.

Under the ordinary existing solar deeming schedule, 2029 corresponds to a two-year period.

Under the announced mid-scale arrangements, the STC factor for a qualifying project would instead continue to be based on five years.

The intention is therefore that the mid-scale calculation basis does not progressively lose another year simply because the installation occurs closer to 2030.

For businesses with larger projects that may take longer to approve, engineer and build, that provides a different incentive profile from the existing declining deeming schedule.

Does this mean a 2029 project receives exactly the same STCs as a 2026 project?

Not necessarily.

The safest way to describe the announcement is:

the mid-scale STC factor will be based on a five-year deeming period each year through 2030.

The eventual STC entitlement for a particular system can still depend on applicable scheme calculations and eligibility requirements.

Factors can include:

  • system capacity
  • installation location
  • equipment
  • applicable STC calculation rules
  • final regulations.

The Government has announced a consistent five-year basis, not a guarantee that every project will receive an identical number of certificates.

Does this mean the dollar value stays the same?

No.

This is probably the most important misconception to avoid.

There are two separate variables:

1. The deeming basis

The Government says the mid-scale STC factor will use five years each year through 2030.

2. The market value of an STC

STCs are tradable certificates.

Open-market pricing is influenced by supply and demand and can vary. The STC clearing house operates separately at its prescribed clearing-house price.

So:

Five-year deeming basis ≠ guaranteed five-year dollar value

A project installed in 2029 may have its mid-scale STC factor calculated using the announced five-year basis while the market price of certificates at that time is different from the market price in 2026.

Is the commercial solar rebate therefore guaranteed through 2030?

No.

Calling STCs a “rebate” is convenient shorthand, but technically the SRES is a certificate-based incentive scheme.

For an eligible project, STC value is commonly assigned and reflected as a reduction in the upfront installation cost.

But that amount is not a guaranteed fixed Government rebate.

Businesses comparing projects should therefore distinguish between:

  • certificate eligibility
  • certificate calculation
  • certificate market value.

Should a business delay its solar project because the five-year factor remains?

Not on that basis alone.

The announced approach means there may be less incentive pressure from the usual annual reduction in solar deeming for qualifying mid-scale systems.

But project timing should still consider the wider commercial case.

Waiting can also mean delaying:

  • electricity-cost reductions
  • onsite renewable generation
  • emissions reduction
  • planned electrification
  • battery integration.

A project may also require time for:

  • network approval
  • engineering
  • planning
  • procurement
  • construction scheduling.

Incentives are only one part of that decision. System capacity should still be based on electricity consumption, self-consumption and site constraints. See our guide to commercial solar system sizing.

What if my project is 99 kW?

The announced five-year mid-scale treatment relates to the new category for solar above 100 kW and no more than 1 MW.

Existing arrangements for systems below 100 kW are not being replaced by the announced mid-scale changes.

What if my project is 200 kW?

A 200 kW system falls within the announced mid-scale capacity range.

If the regulations commence as intended and the project meets all applicable eligibility requirements, it may be able to access the new STC treatment, including the announced five-year factor basis.

What if the system is 1 MW?

The announced upper limit is no more than 1 MW.

For expansions to existing systems, the announced eligibility criteria also provide for a maximum combined capacity of 1 MW.

What if the project is larger than 1 MW?

New systems greater than 1 MW are expected to remain under the Large-scale Renewable Energy Target, subject to the applicable LRET requirements.

These systems would therefore continue to operate under the LGC framework rather than the announced mid-scale STC pathway.

Important: check the rules before installation

As at 9 September 2026, the mid-scale expansion remains subject to the required regulations being in place.

The CER has said it will publish further information on commencement dates and eligibility requirements before the changes take effect.

Businesses planning systems above 100 kW should therefore confirm the final position before installation rather than relying solely on the policy announcement.

The takeaway

For businesses considering commercial solar between 100 kW and 1 MW, the Government’s announced five-year STC approach is potentially significant.

The proposed structure means the mid-scale STC factor would continue to use a five-year deeming period each year through 2030 rather than stepping down annually.

But remember:

The five-year calculation basis is intended to remain consistent.

The dollar value of individual STCs is not guaranteed to remain consistent.

That distinction is important when comparing commercial solar projects over the next several years.

Frequently asked questions

Do commercial solar STCs reduce every year?

Under the Government’s announced mid-scale arrangements, the STC factor for eligible solar above 100 kW and no more than 1 MW would be based on a five-year deeming period each year through 2030.

Will a 2029 mid-scale solar system only receive two years of deeming?

Under the announced arrangements, no. The mid-scale STC factor would still use a five-year basis.

Final eligibility remains subject to the required regulations.

Is the STC price fixed until 2030?

No.

Open-market STC prices can fluctuate according to supply and demand.

Does a five-year deeming period mean a guaranteed rebate?

No.

It relates to the certificate calculation basis, not a guaranteed dollar amount.

When do the new commercial solar STC rules start?

The Government intends for the changes to apply from 1 October 2026, subject to regulations being in place.

Planning commercial solar between 100 kW and 1 MW?

Carbon Heroes can assess your interval electricity data, site requirements and energy costs to determine whether a larger commercial solar system makes sense for your business.

The applicable certificate treatment should also be confirmed against the rules in force when the project proceeds.

Talk to us about your site for a commercial assessment covering sizing, tariffs and the five-year STC treatment.

Sources

Ready to get started?

Planning a commercial solar project before 2030?

Compare system size and project timing using your bills and interval data, with the applicable STC assumptions made clear in your assessment.

1300 728 387
Assess my solar project and STCs